M & N CONSTRUCTION provides a range of complimentary pipeline construction services to the small and medium diameter markets. This includes pipeline installation, facility construction, river crossings, and pipeline repair and maintenance. The management and key field personnel have experience in pipeline installation of more than 25 years.
The following is a list of some of the recent projects completed by these personnel, with job references. We have also included our key personnel listing, equipment listing and rate sheets for your review.
SOUTHERN PACIFIC RESOURCES
Approx. 16 Km of 8” Steel and 4.5 Km of 6” SDR 6.3 HDPE, Fort McMurray area.
NEXEN LONG LAKE
20” Natural Gas Pipeline approx. 1.7 km 20” 11.1 wall Gr. 359 Steel Pipe, Fort McMurray area.
CNRL
Approx. 150km of 2” to 12” Steel and HDPE pipe.
INTER PIPELINE FUND
Wolf Lake Loop Project Build and install facility upgrades at LaCorey & Wolf Lake, Bonnyville Area.
Piping ranging from 2” to 24”.
APACHE CANADA
Facility expansions by Brownfield (2-10-39-10 W4m) and Throne (9-15-35-09 W4m), with pipe ranging from 2” to 8” Steel and Fibre glass.
CONNACHER OIL & GAS
Approx. 4km of 6” 8” 10” 12” 14” above ground Steam Line with 3 SAGD Pads, Fort McMurray area.
NEXEN LONG LAKE
Source Water Well Tie Ins approx. 18km 8” steel 12’ ditch cover, Fort McMurray area.
TRANSGAS
Approx. 47km of 6” 8” 10” HDPE and 8” Steel, Estevan, Saskatchewan
INTER PIPELINE FUND
Bow River Pipeline Segregation Project Build and install upgrades for 15 facilities pipe ranging from 6” to 16”, Coronation to Milkriver.
PETROBANK ENERGY AND RESOURCES LTD.
Approx. 60km of 6’’steel and 70km of 3” and 4” Flexpipe in the Weyburn, Saskatchewan Area.
QUICKSILVER RESOURCES
Approx. 6km OF 16” HDPE, 12km of 12” HDPE, 20km of 8” HDPE, 25km of 6” HDPE, 10km of 4” HDPE in the Penhold Area.
APACHE CANADA
Approx. 35km of 3’’ and 4” steel gathering system in the Brownfield Area.
APACHE CANADA
Approx. 25km of 6’’ in the Brownfield Area.
DEVON
Approx. 10km of 4 & 6’’, HDPE in the Nevis Area.
Approx. 80 km of 4”, 8”, 10”, and 12” steel in Conklin Area.
QUICKSILVER RESOURCES
Approx. 50 km of 6, 8, 10, & 12’’, HDPE in the Chigwell Area.
PEMBINA
Approx. 48km of 6 & 12’’ in the Drayton Valley Area.
ROCKYVIEW
Approx. 25km of 6’’ gas line steel in the Ponoka Area.
DEER CREEK
Approx. 60km of 8’’and 12” steel common ditch in the Fort McKay Area.
APACHE ZAMA
Approx. 50km of 4” and 6’’ with 25 well tie in located near the Zama Area.
COMPTON PETROLEUM CORPORATION
Approx. 40km of 4 & 6 ’’ in the Gladys Area.
THUNDER ENERGY
Approx. 20km of 4’’ in the Rycroft Area.
ESPRIT EXPLORATION LIMITED
Approx. 35km of 6’’ insulated in the Olds Area.
ESPRIT EXPLORATION LIMITED
Approx. 10km of 4’’ in the Acme Area.
ESPRIT EXPLORATION LIMITED
Approx. 17km of 4’’ in the Blackie Area.
APACHE CANADA LTD.
C/O MILLENIA RESOURCE CONSULTING
Approx. 60km of 4” & 6” in the Zama Lake Area.
CANADIAN NATURAL RESOURCES LTD.
Approx. 110km of 3”, 4”, & 6” in the Jean Lake/Leige Area
SUNCOR ENERGY INC.
Approx. 5.5km of 12” insulated in the Fort McMurray.
ESPRIT EXPLORATION LIMITED
Approx. 20km of 4” in the Acme area.
CONOCO CANADA RESOURCES LTD.
Approx. 150km of 3”, 4”, & 6” in the Hanna area.
CANADIAN NATURAL RESOURCES
Approx. 60km of 12” in the Elk Point, Bonnyville area.
CANADIAN NATURAL RESOURCES
Approx. 110km of 4”, 6” & 8” in the Wabasca area.
TRANSCANADA MIDSTREAM
Approx. 1.2km of 2”, 4”, 12”, 16”, 20” common ditch, Ft. McMurray
CANADIAN NATURAL RESOURCES
Approx. 32km of 6” in the Foremost Area.
CANADIAN NATURAL RESOURCES
Approx. 100km of 6”, 8”, & 10” in the Wabasca Area.
If you require further information to qualify us on your bid list please call :
Archie Merchant Office (403) 578-2016 Cell (403) 575-0046
|