Our Projects and Clients

After nearly two decades in the pipeline construction business, M & N Construction has had the pleasure of working on a number of projects throughout western Canada.

Our experience includes:

  • SAGD flowlines
  • River crossings
  • Pump facilities and pump stations
  • Terminals and bulk product storage
  • Pipeline integrity projects
  • Structural steel construction

Below is a list of some of our most recent clients and the projects we completed for them:

grand cache pipeline project

TRANSGAS – April 2014 – October 2014
132 km of 16” Pipeline
Bahurst SK to Rosetown SK

CENOVUS ENERGY – October 2013 – May 2014
15 km of 12” Pipeline
Conklin AB

SUNCOR – October 2013 – April 2014
16” OSPL Horse River Line Replacement
10” NG Horse River Line Replacement
Fort Mc Murray AB

PENGROWTH - August 2013 – April 2014
Construct Structural Steel and Piping for 50 mods
Coronation AB

VANTAGE PIPELINE CANADA ULC – March 2013 – November 2013
2 - Pigging Facilities of 10” 4.8 mm Gr.359 CAT II Pipeline.
12 - Block Valve sites of 10” 4.8 mm Gr.359 CAT II Pipeline.
Maple Creek SK to Assiniboia SK

VANTAGE PIPELINE CANADA ULC – August 2012 – November 2013
328 km of 10” 4.8 mm Gr.359 CAT II Pipeline
Maple Creek SK to Assiniboia SK

SUNCOR – August 2012 – October 2012
16” OSPL Line Replacement
Wandering River AB

SOUTHERN PACIFIC RESOURCES - January 2012 – May 2012
Above Ground Flowlines:
210 meters of 16” Sch.40 A106 Gr. B (Steam Line)
1040 meters of 12” Sch.40 A106 Gr. B (Steam Line)
210 meters of 14” Sch.40 A106 Gr. B (Emulsion Vapour Line)
820 meters of 12” Sch.40 A106 Gr. B (Emulsion Vapour Line)
220 meters of 10” Sch.40 A106 Gr. B (Emulsion Vapour Line)
1030 meters of 10” Sch.40 A106 Gr. B (Emulsion Liquid Line)
220 meters of 8” Sch.40 A106 Gr. B (Emulsion Liquid Line)
1250 meters of 3” Sch. 80 A106 Gr.B (Fuel Gas Line)
Fort Mc Murray AB

CANADIAN NATURAL RESOURCES – January 2012 – April 2012
Approximately 100 km of 8”, 10” & 12” Steel in the Wabasca Area

NEXEN - September 2011 – March 2012
Above Ground Flowlines:
1080 meters of 12” 9.53 mm Gr.448 CAT III Q&T (Steam Line)
1080 meters of 12” 9.53 mm Gr.359 CAT II (Produced Gas Line)
1080 meters of 10” 7.10 mm Gr.359 CAT II (Produced Emulsion Line)
220 meters of 3” 7.62 mm A333 Gr.6 (Fuel Gas Line)
Below Ground Pipeline:
860 meters of 3” 4.8 mm Gr.359 CAT II (Fuel Gas Line)
Anzac AB

SOUTHERN PACIFIC RESOURCES – November 2011 – February 2012
6 pipe modules fabricated, painted and shipped to site Northwest of Fort McMurray.
Coronation AB

PENGROWTH - August 2011 – February 2012
Above Ground Flowlines:
370 meters of 6” Sch.120 A106 Gr. B (Steam Line)
370 meters of 4” Sch.80 A106 Gr. B (Emulsion Vapour Line)
370 meters of 4” Sch.80 A106 Gr. B (Emulsion Liquid Line)
370 meters of 3” Sch. 80 A106 Gr.B (Fuel Gas Line)
Well Pad – with 2 production well heads, 2 Injection well heads
Revamp River water Pump House and Retest P/L
Install 3” Disposal P/L’s
Install 8” Raw Water P/L
Bonnyville AB

NEXEN LONG LAKE – March 2011 – July 2011
20” Natural Gas Pipeline approximately 1.7 km 20” 11.1 wall Gr. 359 Steel Pipe. Fort McMurray area.

SOUTHERN PACIFIC RESOURCES – January 2011 – April 2011
Approximately 16 km of 8” Steel and 4.5 km of 6” SDR 6.3 HDPE Fort McMurray area.

TRANSGAS – August 2010 – October 2010
Approximately 23 km of 6” Steel, North Battleford, Saskatchewan area

TRANSGAS – August 2010 – October 2010
Approximately 22 km of 6” Steel, Stoughton, Saskatchewan area

BESCO – October 2009 – February 2010
Approximately 18 km 10”, 18 km 8”, 16 km 6” Steel, Lampman, Saskatchewan area

CNRL – September 2010 – April 2011
Approximately 150 km of 2” to 12” Steel and HDPE pipe.

INTER PIPELINE FUND – September 2010 – December 2010
Wolf Lake Loop Project Build and Install facility upgrades at LaCorey& Wolf Lake, Bonnyville Area. Piping ranging from 2”to 24”.

APACHE CANADA – June 2010 – November 2010
Facility expansions by Brownfield (2-10-39-10 W4m) and Throne (9-15-35-09 W4m), with pipe ranging from 2” to 8” Steel and Fibreglass.

NEXEN LONG LAKE – January 2010 – March 2010
Source Water Well Tie Ins approximately 18 km 8” steel 12’ ditch cover, Fort McMurray area.

CONNACHER OIL & GAS – June 2009 – February 2010
Approximately 4 km of 6” 8” 10” 12” 14” above ground Steam Line with 3 SAGD Pads Fort McMurray area.

INTER PIPELINE FUND – June 2009 – January 2010
Bow River Pipeline Segregation Project Build and install upgrades for 15 facilities pipe ranging from 6” to 16” Coronation to Milkriver

PETROBANK ENERGY AND RESOURCES LTD. – January 2009 – April 2009
Approximately 60 km of 6” steel and 70 km of 3” and 4” Flexpipe in the Weyburn, Saskatchewan

QUICKSILVER RESOURCES – August 2008 – January 2009
Approximately 6 km OF 16” HDPE, approximately 12 km of 12” HDPE, approximately 20 km of 8” HDPE, approximately 25 km of 6” HDPE, approximately 10 km of 4” HDPE in the Penhold Area.

DEVON – November 2008 – April 2009
Approximately 10 km of 4 & 6”, HDPE in the Nevis Area.
Approximately 80 km of 4”, 8”, 10”, and 12” steel in Conklin Area.

QUICKSILVER RESOURCES – January 2007 – April 2007
Approximately 50 km of 6, 8, 10, & 12”, HDPE in the Chigwell Area.

PEMBINA – October 2006 – April 2007
Approximately 48 km of 6 & 12” in the Drayton Valley Area.

ROCKYVIEW – October 2006 – April 2007
Approximately 25 km of 6” gas line steel in the Ponoka Area.

DEER CREEK – January 2006 – April 2006
Approximately 60 km of 8”and 12” steel common ditch in the Fort McKay Area.

APACHE ZAMA
Approximately 50 km of 4” and 6” with 25 well tie in located near the Zama Area.

COMPTON PETROLEUM CORPORATION
Approximately 40 km of 4 & 6” in the Gladys Area.

THUNDER ENERGY
Approximately 20 km of 4” in the Rycroft Area.

ESPRIT EXPLORATION LIMITED
Approximately 35 km of 6” insulated in the Olds Area.

ESPRIT EXPLORATION LIMITED
Approximately 10 km of 4” in the Acme Area.

ESPRIT EXPLORATION LIMITED
Approximately 17 km of 4” in the Blackie Area.

APACHE CANADA LTD. (C/O MILLENIA RESOURCE CONSULTING)
Approximately 60 km of 4” & 6” in the Zama Lake Area.

CANADIAN NATURAL RESOURCES LTD.
Approximately 110 km of 3”, 4”, & 6” in the Jean Lake/Leige Area.

SUNCOR ENERGY INC.
Approximately 5.5 km of 12” insulated in the Fort McMurray.

ESPRIT EXPLORATION LIMITED
Approximately 20 km of 4” in the Acme area.

CONOCO CANADA RESOURCES LTD.
Approximately 150 km of 3”, 4”, & 6” in the Hanna area.

CANADIAN NATURAL RESOURCES
Approximately 60 km of 12” in the Elk Point, Bonnyville area.

CANADIAN NATURAL RESOURCES
Approximately 110 km of 4”, 6” & 8” in the Wabasca area.

CANADIAN NATURAL RESOURCES
Approximately 32 km of 6” in the Foremost Area.

CANADIAN NATURAL RESOURCES
Approximately 100 km of 6”, 8”, & 10” in the Wabasca Area.

More references are available upon request. To connect with us, call 403-578-2016 or email us via our contact form.